Capitalists Today
  • Investing
  • Stock
  • Business
  • Politics
Investing

BHP’s Copper and Iron Ore Assets Deliver “Strong” Results

by admin January 21, 2026
January 21, 2026

Commodities giant BHP (ASX:BHP,NYSE:BHP,LSE:BHP) has published an operational review for the half year of 2025, highlighting celebratory results at its copper and iron ore operations, including Australia.

BHP Chief Executive Officer Mike Henry attributed the positive price environment while recognising the company’s achievements, citing that copper was up 32 percent while iron ore was 4 percent higher.

Escondida, BHP’s flagship copper operation located in the Atacama Desert in Northern Chile, was said to have achieved record concentrator throughput.

The Chilean project is regarded as the world’s largest copper concentrate and cathodes producer, displaying a production record of 644,000 kilotonnes.

“Antamina has also lifted its production guidance, and Spence and Copper South Australia are tracking to plan, with Copper South Australia achieving record refined gold output,” Henry added.

The company’s South Australian copper assets include the Olympic Dam, Carrapateena, and Prominent Hill projects, which were recently highlighted in a copper outlook and review by the South Australian Government.

“BHP is the largest producer of copper in the world, and we expect to grow our copper base from 1.7 million tonnes to around 2.5 million tonnes per annum,” said BHP COO Edgar Basto in an October 2025 statement.

For iron ore, BHP reported that it achieved record first half production and shipments at its Western Australia Iron Ore (WAIO) operation.

WAIO’s production rose 1 percent compared to its previous record of the same period, having a total of 146.6 million tonnes of iron ore in the half-year to December 31.

Volumes from BHP’s 50-50 Brazilian joint venture Samarco were also highlighted, rising as a result of strong operational performance at the second concentrator following its restart at the end of H1 FY25.

Main dam commissioning at Samarco is advanced and scheduled for completion by 2029.

In a separate announcement, BHP updated its cost estimate for Stage 1 of its Jansen potash project, which is said to be on track for production in mid-2027.

From the previously estimated range of US$7.0 billion, the cost now stands at US$7.4 billion (including contingencies). The initial estimate of the investment cost in August 2021 was US$5.7 billion.

“As announced in July 2025, these cost increases have been driven by inflationary and real cost escalation pressures, design development and scope changes and lower productivity outcomes,” BHP said.

The mining giant said that it is entering the second half of financial year 2026 “with strong operating momentum.”

Half-year financial results of BHP are scheduled to come out on February 17.

“We’re investing for the decade ahead, with a significant copper growth pipeline and a pathway to approximately 2 million tonnes of attributable copper production in the 2030s.”

Securities Disclosure: I, Gabrielle de la Cruz, hold no direct investment interest in any company mentioned in this article.

This post appeared first on investingnews.com

previous post
Valentino, founder of Italian luxury empire, dies at 93
next post
Laramide Exits Kazakhstan Uranium Project After Government Policy Shifts

You may also like

Apollo Silver Announces Return of Tom Peregoodoff as...

February 12, 2026

Sirios Resources: Advancing a Multi-million-ounce Gold Project in...

February 12, 2026

RETRANSMISSION: Tartisan Nickel Corp. Intersects 11.0 Metres of...

February 12, 2026

SAGA Metals Provides Update on MRE Drilling Program...

February 12, 2026

Oreterra Announces Over-Subscription and Upsizing of Non-Brokered Private...

February 12, 2026

1911 Gold to Present at the Metals &...

February 11, 2026

Crypto Market Update: Clarity Act stalls as Banks...

February 11, 2026

Standard Uranium Initiates Winter Drill Program at Corvo...

February 11, 2026

Tartisan Nickel Corp. Intersects 11.0 Metres of 1.05%...

February 11, 2026

Ten Bodies Found as Mexico Probes January Kidnapping...

February 11, 2026

Leave a Comment Cancel Reply

Save my name, email, and website in this browser for the next time I comment.

    Join our mailing list to get access to special deals, promotions, and insider information. Your exclusive benefits await! Enjoy personalized recommendations, first dibs on sales, and members-only content that makes you feel like a true VIP. Sign up now and start saving!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Recent Posts

    • Sirios Resources: Advancing a Multi-million-ounce Gold Project in Québec’s James Bay Region

      February 12, 2026
    • Apollo Silver Announces Return of Tom Peregoodoff as Board Nominee and Prospective Executive Chair

      February 12, 2026
    • Oreterra Announces Over-Subscription and Upsizing of Non-Brokered Private Placement to $8 Million

      February 12, 2026
    • SAGA Metals Provides Update on MRE Drilling Program at Trapper South, Radar Critical Minerals Project in Labrador

      February 12, 2026
    • RETRANSMISSION: Tartisan Nickel Corp. Intersects 11.0 Metres of 1.05% Ni, 0.33% Cu Including 2.0 Metres of 4.79% Ni, 1.25% Cu at the Kenbridge Nickel-Copper-Cobalt Project, Northwestern Ontario

      February 12, 2026
    • About us
    • Contacts
    • Privacy Policy
    • Terms and Conditions
    • Email Whitelisting

    Disclaimer: capitaliststoday.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2025 capitaliststoday.com | All Rights Reserved

    Capitalists Today
    • Investing
    • Stock
    • Business
    • Politics